Cold Storage

ALIMENTS ULTIMA – FED\EX PROJECT (2010)
Technical and economic assessment to determine the best scenario of a new 25 000 sq.ft. cooler.

DISTAL BOUCHERVILLE – Distribution Centre (2008)
Technical and economic study aimed at analyzing the various impacts of larger warehousing space on the existing refrigeration system.

ULTIMA FOODS – Distribution Centre (2007)
Technical and economic study of converting a dry warehouse to a refrigerated warehouse.

BOEUF MÉRITE WAREHOUSE – MÉTRO RICHELIEU – City of Montreal (2006)
Feasibility study on the replacement of R-22 direct-expansion evaporators with recirculated ammonia evaporators including the addition of screw compressors.

MÉTRO RICHELIEU 2000 INC. – Montreal (2001)
Study to determine the advantages and profitability of three heat recovery designs for refrigeration units in supermarkets.

SADC – Gaspé Nord (2001)
Feasibility study to determine the dimensions, characteristics and construction costs of a 20 500 square-foot refrigerated warehouse and its ammonia refrigeration system.

Comments are closed.