Others

BENOÎT VACHON HIGH SCHOOL (2010)
Technical and economic study for a new water chiller.

LOUIS-PHILIPPE PIGEON BUILDING – Quebec City (2008)
Energy saving study to replace actual chillers and cooling towers.

LAVAL HOSPITAL – Quebec City (2008)
Pre-project study to implement 250 000-lb ice banks used for thermal storage for the air conditioning system of the hospital.

HOWMET CASTINGS – City of Laval (2005)
Feasability study on the construction of a free cooling system using outside air to ensure air conditioning and cooling of machines in an aluminium parts casting plant.

HÔPITAL DE L’ENFANT-JÉSUS – City of Quebec (2004)
Pre-project study to implement 250 000-lb ice banks used for thermal storage for the air conditioning system of the hospital.

MARLY BUILDING – Sainte-Foy, Québec (2003)
Comparative study on the HCFC-123 or HCF-134A conversion of three CFC-11 centrifuge coolers with a total capacity of 1 125-tons.

DISTILLERIES SCHENLEY- Valleyfield (2003)
Pre-project study to determine the optimal solution for the air conditioning of the plant bottling sector.

QUÉBEC NATIONAL FINE ARTS MUSEUM- City of Quebec (2003)
Expertise to determine the causes of the capacity shortage of HCFC-22 reciprocal coolers of a total capacity of 500-tons. Recommendations as to necessary corrections.

LE 1150 CHEMIN ST-LOUIS BUILDING – City of Quebec (2003)
Study for the replacement of a CFC-11 centrifuge cooler and a HCFC-22 reciprocal cooler with two HCF-134A centrifuge coolers of a total capacity of 400-tons.

HÔPITAL ST-FRANÇOIS D’ASSISE EMERGENCY ROOM – City of Quebec (2003)
Feasability study on the installation of a geoghermal heat pump with artesian well that will be used to heat and condition the hospital emergency room.

CENTRE HOSPITALIER UNIVERSITAIRE DE QUÉBEC (CHUQ) – Quebec (2001)
Strategy planning study for the conversion or replacement of CFC-11 and CFC-113 centrifuge coolers in three hospitals of the CHUQ with a total cooling capacity of 925-tons.